Could anyone tell me the points to keep in mind while the ac is being installed
and the necessary test which has to be done when the ac is installed
I am thinking of installing the IDU AND ODU back to back on a wall is it alright????
and the necessary test which has to be done when the ac is installed
I am thinking of installing the IDU AND ODU back to back on a wall is it alright????