yes
the boxs were held up because i thought i would go all out and install an EMI/RF filter too
making the box a passive conditioner as well
i imported a lot from Schanffner
post diwali
the power strip/cum passive filter will be ready
the cable is german
the contacts are furukawa copper gold plated
im set to go
the boxs were held up because i thought i would go all out and install an EMI/RF filter too
making the box a passive conditioner as well
i imported a lot from Schanffner
post diwali
the power strip/cum passive filter will be ready
the cable is german
the contacts are furukawa copper gold plated
im set to go