I'm in for 16 caps. I believe procuring thesecovers the entire BOM for the build excluding the Trafo, Heat sinks and the Chassis.
Yes, It complete final missing piece in electronics component on PCB.
I'm in for 16 caps. I believe procuring thesecovers the entire BOM for the build excluding the Trafo, Heat sinks and the Chassis.
I will need amount tomorrow to get caps in time.Expected delivery time is 7 days from the date of order.I will close this GB in tomorrow afternoon.
Regards,
Sachin
As you said minimum needed is 8 people, will pay once you have 8 on board for GB.
Thanks
Pandu
Typically for Pass amps, you need to look for 105 deg C caps and not 85 deg caps.This is the information I can find in the datasheet -
CORNELL DUBILIER
Product No: SLPX153M050H4P3
ESR 120Hz : 0.031?
ESR 20KHz : 0.023?
Ripple Current 120Hz : 6.56Arms
Ripple Current 20KHz : 8.20Arms
CAPACITOR ALUM ELEC 15000UF 50V 20%, SNAP-IN
Capacitance: 15000F
Capacitance Tolerance: 20%
Voltage Rating: 50V
ESR: 0.031ohm
Life Time @ Temperature: 3000 hours @ 85C
Height: 45mm
Diameter: 35mm
Capacitor Case Style: CAN
Here is the cabinet for my F5T v2 (v3?) build. Ready to go off for anodizing, after necessary holes are punched.
Cheers.
Got the cabinet done.
Here is the cabinet for my F5T v2 (v3?)
Hi all,
I have received the latest quote for Cornell Dubilier 15000uf/50V Snap in caps.Final price would be 260/cap,minimum quantity is 100 pieces.Please post your interest here with quantity required.I will need payment in advance.
Regards,
Sachin
Sugessted method is leave that piece (not sure whether anything needs to be jumpered) or set it to mid values .
Members interested so far:
Baswamin =16
Omishra = 16
pdhanwada = 16
Vktarun =16
Captrajesh = 16
Kroyin = 8
Total = 88
We need one more member for CDE GB.I will buy remaining 16 caps if required.
All other parts have been received only waiting for remaining Diodes which already been shipped from US.
I request all F5T GB participants to transfer their share(ignore if paid).I am short of funds.I will start shipping kits in one week.
Regards,
Sachin